- 积分
- 0
- 注册时间
- 2004-4-7
- 仿真币
-
- 最后登录
- 1970-1-1
|
系统是win2000,isight8+excell2003
在excell2003中,设置了宏的安全级别为低,可靠性来源都选上了,
在excell中加载宏,设置都是按照例子说明作的。
输入输出映射和方法都选好了,但是运行时出错:
Excel code fence2 exceeded 30 second elapsed time limit
Time-lmit exceeded evaluating::eXCELO
Error evaluating control expression EvaluateExcel fence2-can't read"errRet":no such variable
查找过了论坛里关于isight与excell链接的所有的帖子,但还是不知道问题出在哪,请指教!
非常感谢!
部分log文件
PATH: /tm/Task1 TYPE: Status-Initialization Input Values Initialized successfully
PATH: /tm/Task1 TYPE: Status-Initialization Task Task1 successfully initialized.
PATH: /tm/Task1 TYPE: Status-Task api_EndTask Task1 completed
PATH: /tm TYPE: Milestone-TaskMgr All Tasks are Ready
PATH: /tm TYPE: Milestone-TaskMgr Task1 - Starting task plan
PATH: /tm/Task1 TYPE: Status-TaskPlan Evaluating control expression EvaluateOptimizePlan NewPlan1
PATH: /tm/Task1 TYPE: Control Normal
PATH: /tm/Task1 TYPE: Control Normal
PATH: /tm/Task1 TYPE: Control Normal
PATH: /tm TYPE: Milestone-TaskMgr Task1 - Starting optimization plan
PATH: /tm TYPE: Milestone-TaskMgr Task1 - Starting optimization technique (NewPlan1 - Step1)
PATH: /tm/Task1 TYPE: Status-Task Evaluating control expression EvaluateExcel fence2
PATH: /tm/Task1 TYPE: Error-Excel Excel code fence2 exceeded 30 second elapsed time limit
PATH: /tm/Task1 TYPE: Info-Excel The run was unsuccessful because fence2 exceeded its elapsed
time limit of 30 seconds, so iSIGHT terminated it. If you
want to change the elapsed time limit, use the Process Integration
tool. The elapsed time limit can be found in the program properties
dialog for fence2.
PATH: /tm/Task1 TYPE: Error-Task Time-limit exceeded evaluating ::eXCEL0
PATH: /tm/Task1 TYPE: Error-Task Error evaluating control expression EvaluateExcel fence2 - can't read "errRet": no such variable
PATH: /tm/Task1 TYPE: Status-Task Evaluating TaskProcess epilogue statement ScaleConstraints
PATH: /tm/Task1 TYPE: Status-Task parameter Perimeter violated target by -400.0
PATH: /tm/Task1 TYPE: Status-Task Evaluating TaskProcess epilogue statement CalculateObjective
PATH: /tm/Task1 TYPE: Status-Task TotalPenalty term is 3.40282346638529e+041
PATH: /tm/Task1 TYPE: Status-Objective Penalty value is 3.40282346638529e+041
PATH: /tm/Task1 TYPE: Status-Objective Feasibility of run is: not_useable
PATH: /tm/Task1 TYPE: Status-Task Evaluating TaskProcess epilogue statement PostEvent TaskProcessCompleted
PATH: /tm/Task1 TYPE: Status-Task TASK Task1 RUN NUMBER 5 COMPLETED
PATH: /tm/Task1 TYPE: Error-Simulation SimServer<TaskHost=leo/SimHost=leo> could not run C:/WINNT/system32/cscript.exe //Nologo //Job:Execute //T:30 Task1_fence2_bulk.wsf
PATH: /tm/Task1 TYPE: Error-Parallel Bulk evaluation of data failed. SimServer<TaskHost=leo/SimHost=leo> could not run C:/WINNT/system32/cscript.exe //Nologo //Job:Execute //T:30 Task1_fence2_bulk.wsf
PATH: /tm/Task1 TYPE: Error-Optimization Bulk evaluation of data failed. SimServer<TaskHost=leo/SimHost=leo> could not run C:/WINNT/system32/cscript.exe //Nologo //Job:Execute //T:30 Task1_fence2_bulk.wsf
PATH: /tm TYPE: Milestone-TaskMgr Task1 - End of optimization technique (NewPlan1 - Step1)
PATH: /tm TYPE: Milestone-TaskMgr Task1 - End of optimization plan
PATH: /tm/Task1 TYPE: Error-Plan Error Executing Optimization Plan -
PATH: /tm/Task1 TYPE: Error-TaskPlan Error evaluating :PTIMIZATIONPLAN1
PATH: /tm/Task1 TYPE: Error-TaskPlan Bad TaskPlan Run. Reason is 0
PATH: /tm TYPE: Milestone-TaskMgr Total Elapsed Execution Time: 0 hr 9 min
PATH: /tm TYPE: Milestone-TaskMgr Task1 - Execution Completed
PATH: /tm TYPE: Milestone-TaskMgr Task1 - End of task plan
PATH: /tm TYPE: Milestone-TaskMgr Total Elapsed Execution Time: 0 hr 9 min
PATH: /tm TYPE: Milestone-TaskMgr Task1 - Execution Completed
[ 本帖最后由 exergy 于 2006-8-23 18:49 编辑 ] |
|