- 积分
- 0
- 注册时间
- 2007-6-15
- 仿真币
-
- 最后登录
- 1970-1-1
|
大家好,本人在Canada上学,也是搞 simulation的,最近搞的一个题目是超弹性+粘弹性材料 (hyperelastic +viscoelastic combination). 问题是如果单独用hyperelastic (neo-hookean) material, 题目可以顺利完成,但加入 viscoelastic(one term prony)以后,计算就会中途终止。而且在加载的边上有 volumetric locking 的现象。 我担心是我用的教学版Ansys材料属性不全, 所以请哪位手里有高版本Ansys 的帮忙运行一下,看看是否也会中途停止。下面是我对问题的全面描述, 后面附了 input 文件, 多谢大家了。
Hi everyone,
I'm having trouble when using the combined hyperelastic material(neo-hookean) with viscoelastic (one term prony) in Ansys. The problemis a cone being pulled by uniform pressure at the top and fixed at the
bottom. Plane183 (8 node plane element with uniform reducedintegration) is used with axisymmetric option. This element empolyedmixed u-p formation. The hyperelastic material is assumed to beincompressible (u=0.5) or nearly incompressible (u=0.4995). (actuallyif use u=0.4995, Ansys will not run at all, the element will not format the first substep)
The model runs fine if only the neo-hookean hyperelastic
material (u=0.5) is used but will crash at about 30% of completionwhen viscoelastic material is combined. By looking at the hydrostaticpressure distribution in post-processing, there is obvious checkerboardpattern along the loading edge, so it seems that volumetric lockingcauses the analysis to stop.
My question is why this happens when viscoelastic material is combined but not happens when only hyperelastic material is used.
My guess is our version of Ansys is too limited (university intermediate version)?
So if anyone in this forum has higher version Ansys in his/herhand, can he/she kindly run this analysis for me and see if it's due tothe version problem?
The attached input file ?scripts_e02r1pull? combines hyperelasticand viscoelastic material. The run will take only a couple of minutes.Thanks a lot.
rz
/BATCH
/FILNAME,e02r1_pull,0
/TITLE,e02r1
/PREP7
/com >> define element type and material
ET,1,PLANE183
KEYOPT,1,3,1
KEYOPT,1,6,1
KEYOPT,1,10,0
TB,HYPE,1,1,2,NEO
TBTEMP,0
TBDATA,,1,0,,,,
TB,PRONY,1,1,1,SHEAR
TBTEMP,0
TBDATA,1,0.4,14,,,,
/com TB,PRONY,1,1,1,bulk
/com TBTEMP,0
/com TBDATA,,0.4,2,,,,
/com >> define keypoint
K,1,0,0,,
K,2,0,1,,
K,3,1,0,,
K,4,0.1,1.012916581,,
K,5,0.117647058,0.993055471,,
K,6,0.12,0.992916581,,
K,7,0.6,0.992916581,,
K,8,0.1,1.6,,
/com >> generate quater circle
FLST,2,2,8
FITEM,2,0,0,0
FITEM,2,1,0,0
CIRCLE,P51X, , , ,90, ,
/com >> generate straight lines
LSTR, 9, 1
LSTR, 1, 10
LSTR, 8, 4
LSTR, 6, 7
/com >> generate small circle
LARC, 4, 6, 5
/com >> divide lines
LDIV, 1, 0.70
/com >> copy contact zone lines
LGEN,2,7, , ,0,-0.04, , ,0
/com >> shorten copied lines
LDIV, 8, 0.4539919309218844E-01
LDELE, 8
LSTR, 11, 14
LSTR, 10, 13
/com >> create area
AL,10,7,9,8
LSBL, 3, 9
AL,9,11,8,1,2
/com >> manual meshing the contact zone
/com >> transverse lines
LESIZE,8, , ,5, , , , ,1
LESIZE,7, , ,80, , , , ,1
/com >> mesh the area
MSHAPE,0,2D
MSHKEY,1
AMESH,1,1
SMRT,4
MSHKEY,0
AMESH,2,2
SAVE
/com >> apply surface load
DL,10, ,UX,0
DL,11, ,UX,0
FLST,2,68,1,ORDE,3
FITEM,2,1
FITEM,2,290
FITEM,2,-340
SF,P51X,PRES,-2.5
NSEL,S,node,,1418,1452
NSEL,a,node,,1372,1372
NSEL,a,node,,1373,1373
D,all,UY,0, ! APPLY DISPL
NSEL,ALL
/COM, CONTACT PAIR CREATION - START
/COM, CONTACT PAIR PROPERTIES - END
/sol
/com >>analysis parameters
ANTYPE,0
NLGEOM,1
NSUBST,100,10000,30
OUTRES,ALL,3
AUTOTS,1
NEQIT,80
RESCONTRL,DEFINE,ALL,3,10
TIME,1
/com >>message display control
/UIS,MSGPOP,3
/NERR,0,10000,
/com >>nonlinear diagnose
NLDIAG,MAXF,16
NLDIAG,NRRE,1
NLDIAG,EFLG,1
NLDIAG,CONT,1
/com >>run the job
SOLVE
/com 2nd step
/com nsubst,50
/com time, 2000
/com solve
FINISH
! /EXIT,ALL |
评分
-
1
查看全部评分
-
|